What is the proportion of material cost to total production cost for rotary level switch ?
The production cost consists of direct material cost, labour cost and manufacturing facility cost. Normally, the material cost takes up about thirty to forty percent of the total production cost. The figure may vary depending on the specific products, while in order to produce high quality rotary level switch , we never cut down the investment on the material due to corporate parsimony. Besides, we would invest more in the technology introduction and product innovation to improve manufacturing efficiency and lower the overall manufacturing cost.

Guangdong Kaidi Energy Technology Co., Ltd. is a China-based manufacturing company specializing in design, development, manufacturing, sales, and distribution of level transmitter. The pull rope switch series is one of the main products of Kaidi.
magnetic level gauge has attracted much attention as a magnetic float level gauge based on magnetic float level gauge character. This product has a wide range of operating temperatures. Operators are fond of using this product mainly due to the simple and easy operation. Without complicated procedure, it brings convenience and increases efficiency. This product is easy to install and use.

The persistent purpose of KAIDI would be to be among the very competitive level gauge exporters. Please contact.